"Uzbekistan airways" JSC

Tenders

26 Mar 2019

Competition for the purchase of inserts separators for glassware

Currently, Uzbekistan Airways has a need to acquire drawers for glassware for passenger service on flights NAC "Uzbekistan Airways». 1. Drawer for glass of wine (the diameter of the glass – 5cm, height – 10,9cm) in the amount of 300 pieces. 2. Drawerforglassand for shot (the diameter of the glass – 7cm, height 9,5cm, shot – 6cm, height – 7cm) in the amount of 700 pieces. The height of Drawer for glass  must meet the parameters of glassware. Drawerforglass must be of dimensions (length, width) allowing it to be placed in the on-Board service cart of the standard «Atlas». We also ask you to consider the possibility of manufacturing drawer for glass different color: 300 pieces of one color, 700 pieces of other color. In order to determine the possibility of purchasing this product, we ask you to inform the possibility of delivery, possible delivery time, the cost of products on the terms of payment 15% advance payment, 85% upon delivery to Tashkent. If available, we ask you to provide licenses and certificates available from Your company. If Your company has the opportunity and interest in the supply of the above products for the needs of our airline, please contact us using the following contact details: Uzbekistan, Tashkent 100167, Airport «Tashkent», MSD “UZAVIATEXSNAB” NAK, tel/fax /+99871/255-68-37, е-mail: kmts.sg@uzairways.com, uzblog_peo@uzairways.com. We also ask you to provide samples and technical description of the offered products. Your offer please send to our address to 29.03.2019. Commercial offers are accepted by mail, Fax, e-mail. The information must be in Russian or translated into Russian.
26 Mar 2019

Text of the announcement of an open tender

Uzbekistan Havo Yullari announces a tender for the provision of maintenance of aircraft A320NEO consumables and components through access to the exchange fund for the needs of Uzbekistan Airways 1. GENERAL INFORMATION Subsection 1.1 Name of services Services for the provision of consumables and components through access to the exchange fund (for the provision of technical maintenance) of A320NEO aircraft leased by Uzbekistan Airways National Airline Subsection 1.2 Terms of Service Maintenance of consumables and components is provided through access to the exchange fund of spare parts (warehouse for returnable and exchangeable repair parts). Subsection 1.3 Documents for development / production The catalog of IPC components (Illustrated Part Catalog) of the A320NEO aircraft, the requirements of aviation authorities in Europe and the Republic of Uzbekistan for the maintenance and repair of aircraft, including the requirements of Airbus 2. SCOPE For A320NEO aircraft leased by Uzbekistan Airways 3. OPERATION CONDITIONS Components and consumables are used on the A320NEO aircraft in accordance with the requirements of manufacturers of these components and consumables, confirmed by EASA and / or FAA certificates, and in accordance with the requirements of Airbus. 4. TECHNICAL REQUIREMENTS Subsection 4.1 Technical, Functional, and Quality Characteristics (Consumer Properties) of Goods In accordance with the requirements of manufacturers of components, confirmed by certificates of conformity EASA, and / or FAA, as well as in accordance with the requirements of the company Airbus. Subsection 4.2. Reliability requirements International certificates of quality management system AS9100 / ISO9001, FAA - 14 CFR Part 21 Subsection 4.3. Requirements for components, raw materials and operating materials The provider provides access to the exchange fund for the air conditioning system; automatic flight control; communication equipment; electrical equipment; fire fighting equipment; aircraft control systems; fuel system; hydraulic system; equipment of the passenger compartment and the crew cabin; anti-icing system; chassis; lighting and light signaling; navigation equipment; oxygen equipment; pneumatic system; water supply and waste disposal systems; information systems; onboard auxiliary power unit; doors, hatches, doors, lantern, windows; A320NEO aircraft power plant with CFMLEAP-1A26 engine models. All components of these systems must have certificates of conformity EASA and / or FAA Subsection 4.4 Marking Requirements According to EASA and / or FAA Compliance Certificates Subsection 4.5 Size and Packaging Requirements Do not apply Subsection 4.6 Time Requirements The term of the service must be at least 8 years. 5. REQUIREMENTS FOR TRANSFER AND ACCEPTANCE RULES Subsection 5.1 Order of Acceptance The beginning of the service is considered the application for the component. Further, the Contractor shall deliver the workable component from the Contractor’s exchange fund on EXW terms. After the customer has received the component, the Customer sends the inoperable component to the Contractor on DDP terms. Subsection 5.2 Requirements for the transfer of technical and other documents to the customer upon delivery of goods Certificates of conformity EASA, FAA, a list of parts with a limited service life, directives on flight suitability, service bulletin Subsection 5.3 Product Insurance Requirements Not applicable 6. TRANSPORTATION REQUIREMENTS Do not apply 7. STORAGE REQUIREMENTS Do not apply 8. REQUIREMENTS TO THE VOLUME AND / OR THE TERMS OF THE PROVIDING WARRANTIES Not less than 6 months 9. MAINTENANCE REQUIREMENTS The contractor must have experience, at least 5 years, of providing these services in the aircraft В757, В767, A320CEO, A320NEO 10. ENVIRONMENTAL REQUIREMENTS Absent 11. SAFETY REQUIREMENTS Absent 12. QUALITY REQUIREMENTS Quality requirements for components and consumables should be confirmed by certificates of conformity of EASA and FAA. The quality of the services provided by the Contractor must be approved by the lessor. 13. ADDITIONAL (OTHER) REQUIREMENTS Absent 14. REQUIREMENTS FOR QUANTITY, COMPLETE SET, POSITION AND TIME (PERIODICITY) OF DELIVERY Delivery terms: Contractor’s DDP warehouse Shipping Conditions: EXW Contractor Warehouse 15. REQUIREMENT TO THE FORM OF REPRESENTATIVE INFORMATION By email Proposals for the name of the First Archangel Association NAK Khusanova UA (for the Commercial Department), accepted up to 1700 hours on March 31, 2019 at the address: Uzbekistan, 100167, Tashkent, Aviagorodok, AP "UAT" tel / f. 71 - 255-55-28 e-mail: od_uat@mail.ru; od_uat@uzairways.com Contact persons: Tatyana Venyaminovna Krivosheina, head of the contract group of CD tel. 71-255-55-28
05 Mar 2019

Drawers for glassware

Currently, Uzbekistan Airways has a need to acquire drawers for glassware for passenger service on flights NAK "Uzbekistan Airways». 1. Drawer for glass of wine (the diameter of the glass – 5cm, height – 10,9cm) in the amount of 300 pieces. 2. Drawer for glass and for shot (the diameter of the glass – 7cm, height 9,5cm, shot – 6cm, height – 7cm) в количестве 700 штук. The height of Drawer for glass must meet the parameters of glassware. Drawer for glass must be of dimensions (length, width) allowing it to be placed in the on-Board service cart of the standard «Atlas» We also ask you to consider the possibility of manufacturing drawer for glass different color: 300 pieces of one color, 700 pieces of other color. In order to determine the possibility of purchasing this product, we ask you to inform the possibility of delivery, possible delivery time, the cost of products on the terms of payment 15% advance payment, 85% upon delivery to Tashkent. If available, we ask you to provide licenses and certificates available from Your company. If Your company has the opportunity and interest in the supply of the above products for the needs of our airline, please contact us using the following contact details: Uzbekistan, Tashkent 100167, Airport «Tashkent», MSD “UZAVIATEXSNAB” NAK, tel/fax /+99871/255-68-37, е-mail: kmts.sg@uzairways.com, uzblog_peo@uzairways.com. We also ask you to provide samples and technical description of the offered products. Your offer please send to our address to 15.03.2019. Commercial offers are accepted by mail, Fax, e-mail. The information must be in Russian or translated into Russian.
22 Feb 2019

Announcement for the open tendering procedure for repair of landing gears set for Boeing-757 aircraft

Uzbekistan Airways announces a tender for repair of landing gears set for Boeing-757 aircraft operated by Uzbekistan Airways Name of works: Repair of landing gears set for Boeing-757 aircraft Requirements to the Contractor: The contractor and/or his subcontractors shall have an Authorization to perform such kind of services issued by the Aviation authorities (EASA and FAA) and at least 5 (five) years of work experience in this field. Terms of work: In the process of repair, the Contractor shall be guided by the Technology of aircraft engine repairs and other regulatory technical documentation published and approved by the manufacturer . The contractor shall provide a replacement kit of landing gears for rental by Uzbekistan Airways National Aircraft Company for the period of the maintenance (repair) works. Work site: Repair shall be performed on the Contractor’s site in the properly equipped workshops. The repair period shall not exceed 45 calendar days. Requirements to the quality guarantees period and the works and services results: After the repair, the Contractor shall provide the following warranty for the landing gear: - 36 months or 1 000 landing, whichever event comes first. Proposals addressed to First Deputy General Director Husanov U.A. (Commercial Department) shall be accepted before 5.00 pm of Febrary 28, 2019 at the address: UAT, Aviogorodok, Tashkent, 100167, Uzbekistan Tel / Fax: +99871 - 255-55-28 E-mail: od_uat@mail.ru, od_uat@uzairways.com Reference person: Tatyana V. Krivosheina, Head of the contract group CD Tel.: +99871-255-55-28
13 Feb 2019

Provision of services for implementation of an integrated platform for flight activities planning of national airline «Uzbekistan Airways»

«Uzbekistan Airways» has announced the open bidding on performing the services on acquisition and implementation an integrated platform for airline flight activities. Subjectofbidding: 1. Procurement and implementation of an integrated flight planning platform, including information systems\modules «Schedule Planning», «Crew Planning and Managing» and «Operation Control System». Separate delivery and implementation of information systems may be also considered. 2. Technical and consulting support minimum 2 years. Detailed description and specification (RFP) will be provided on request. Conditionsforbidding: Payment conditions: in accordance with the principles of product implementation suggested by Executor the following variant of payment may be provided for: partitioning the payment to installment for implementation (including advance payment in amount 15% (fifteen) of implementation costs, that shall be made during 15 bank days from contract signing, and payment of rest 85% of implementation costs during 60 bank days from the moment of signing the act of product implementation by the contract’s parties) and monthly installments on the base of monthly invoices and duly executed documentation (act of performed works, report on performed works, etc.). Other payment methods may be also considered. Term of service: implementation - 3 (three) calendar months from contract signing. However, implementation of «Schedule Planning» system should be no more than 1 (one) month. Technical support – not less then 2 years from the contract signing. Term of offer validity: not less then 30 (thirty) calendar days. Organizations, having corresponding experience in the field of development, implementation and support of specialized software for civil aviation, may participate in bidding. Offers shall be submitted on letterhead of organization with signature of CEO and seal of organization (sending the scanned copy of offer via E-mail is also permitted) and shall contain the following information: general information about company; list of successfully realized projects in the field of implementation and support of specialized software for aircompanies; detailed list and total costs of services performing; detailed table of compliance with the stated functional requirements; detailed list of work stages with due dates for each stage; requirements for hardware-software complex; term of offer validity. In accordance with the legislation of the Republic of Uzbekistan contract execution with winner of bidding shall be made after corresponding expertise of documents by the Center of complex expertise of the National Agency of Project Management under the President of the Republic of Uzbekistan. Offers are accepted to the following address: 41, Amir Temur avenue, Tashkent, GSP 100060, Uzbekistan. Additional information may be received on: phone: (998-78) 140-47-38 E-mail:itdep@uzairways.com OFFERS ARE ACCEPTEDTILL 12.00 AM (TASHKENT LOCAL TIME) ON FEBRUARY 22, 2019. OFFERS, THAT CONTAIN NOT FULL INFORMATION OR ARE NOT ACCOMPAINED BY FULL PACKAGE OF AFORESAID DOCUMENTS, AS WELL AS THAT ARE SENT AFTER STATED DATE, WILL NOT BE CONSIDERED.
10 Jan 2019

Travel kits

National airline of the Republic of Uzbekistan "Uzbekistan Airways" expresses its respect and wishes prosperity to Your company. Currently, our airline has the need to purchase the following products: - travel kits (set of 13 items) for business class passengers on flights NAC, in the amount – 94 000 pieces of kits (70% in black, 30% in red). Requirements for the composition and quality of products: 1. Travel bag - travel bag with zipper closure, size: ~ 21 cm in length, ~ 12.5 cm in height, ~ 4 cm in width; - material: leather Saffiano or its equivalent, with a characteristic pattern, pleasant to the touch; -bag lining with original pattern in agreement with the airline; - cosmetic bag ensures the safety of the elements in side; - high quality travel bag, all seams and stitches are smooth; - embossed logo NAC is situated on the front side of the travel bag width of ~ 70 mm; - color - 70% black, 30% red (Pantone 1807) 2. Eye mask - mask quilted (size of one element of the screed ~ 3.5*3.5 cm) - the outer side of the mask made of natural, blended fabrics that do not transmit light (gabardine, density of at least 160 g / m2); - light filter; - the inner side is made of cotton; - black elastic band ~ 5 mm wide; - individual package; - mask has original stitch pattern. - color 70% black, 30% red (Pantone 1807) 3. Slippers - quilted Slippers (size of one element of the tie ~3.5*3.5 cm); - closed Cape; - material: cotton fabric (gabardine, density not less than 160 gr / m2); - size 44; - sole: rubberized, non-slip, moisture-resistant, thickness ~ 5 mm, the color of the sole matches the color of the slipper material, shorn ~ 50 SHORE; - individual package; - nameplate with the logo of NAC - color 70% black, 30% red (Pantone 1807) 4. Earplug - anti-noise, non-dimensional, conical shape; - made of elastic hypoallergenic (synthetic) material; - in a transparent individual package containing instructions for use. 5. Shoe horn - Shoe horn with a ring; - dimensions: length ~ 14.5 cm, width ~ 4 cm; - material: durable plastic; - with the logo of NAC - color 70% black, 30% red (Pantone 1807) 6. Hand cream - moisturizing, non-greasy, hypoallergenic, neutral PH (5.5), no strong odor; - volume 10 – 15 ml; - brand-world-class perfume brands 7. Pen - handle with logo NAC; - ball, thin, souvenir; - material: plastic; - size: length ~ 14 cm - color 70% black, 30% red (Pantone 1807) 8. Lip balm - moisturizing, non-greasy, hypoallergenic, with neutral PH (5,5) , no strong smell; - volume: 4 – 4.5 g; - brand-world-class perfume brands 9. Comb - folding; - material: durable plastic; - individual package; - with the logo of NAC - color 70% black, 30% red (Pantone 1807) 10. Toothpaste - hypoallergenic, fluorine-free; - packing: tube; - volume: 5-10 g; - brand-world-class perfume brands 11. Toothbrush - length: ~ 15.5 cm; - one-piece, not sharp on the edges, with a protective cap on the type of "slam suitcase»; - medium hard bristles, white color; - number of longitudinal bristle rows: ~ 3; - number of transverse rows of bristles: ~ 9; - individual package; - color 70% black, 30% red (Pantone 1807) 12. Pillow spray - spray with a gentle relaxing aroma that soothes and relaxes; - helps to facilitate relaxation; - volume: 10-15 ml; - - with original design, composite NAC logo. 13. Face spray - moisturizing, non-greasy, hypoallergenic; - supports the natural water balance of the skin, serves to maintain hydration of the face; - volume: 10-15 ml; - with original design, composite NAC logo. Note: The shelf life of the components is the sets of at least 12 months from the date of manufacture and delivery. All products must have the logo of Uzbekistan Airways. It should be possible to change the design of the package and the items included in the set at least once a quarter. Special requirement: Travel bag for business class passengers is an original travel Makeup in an individual package. Components of amenity kits for business class passengers should be the same in function for both men and women. Color cosmetic bags and its components ( eye mask, Slippers, handle, Shoe horn, comb, toothbrush): black for men, red for women. All materials used in the manufacture of amenity kits for business class passengers, should be non-toxic, harmless, safe; should not have a smell, should not be combustible, should not be piercing and cutting. Coloring of materials, applied elements should be resistant to fading, abrasion when using, washing and cleaning. Travel kits should be new, not used, 2019-2020 years of release, decorated in accordance with the requirements of the Airline. Certificates of conformity, origin of goods and, if necessary, sanitary and epidemiological conclusions should be presented for the Products. Marking of road sets components must comply with the requirements of the legislation of the Republic of Uzbekistan, contain all necessary information, must be made in Uzbek, Russian and English. The validity period of the components of the road sets must expire no earlier than 12 months from the date of delivery of the set. 8. Packaging, labeling should correspond to the nature of the Goods and ensure its complete safety during transportation. 9. All documents and information submitted by Participants, including Proposals, should be in Russian. If any information or documents are submitted in another language, they must be accompanied by a translation into Russian. 10. Delivery on the agreed schedule and according to the terms of the contract. 11. Delivery of Products is carried out on the terms of FCA – airport of departure (warehouse of the cargo agent of the buyer) or DAP – Tashkent, warehouse of the buyer. 12. Participants must necessarily be provided with a commercial offer with the possibility of manufacturing the enterprise of the specified products, possible delivery times, cost of products, on the terms of payment - 15% advance payment, 85% payment upon delivery of the goods. 13. Participants must provided samples of each proposed product in the amount of 1 piece. Restrictions for participation in the Contest: 1. Proposals should be submitted by legal entities (Participants) established in accordance with the legislation of the Republic of Uzbekistan or with the laws of other countries; 2. The participant must not be insolvent, in the process of liquidation or reorganization, be declared insolvent (bankrupt). Also, with respect to the Participant should not be filed claims for insolvency (bankrupt). A participant may not be a company whose property is seized on any grounds and(or) the economic activity of which is suspended. Proposals are accepted at: MSD “UZAVIATEXSNAB” NAC, GSP100167, Uzbekistan, Tashkent, Airport «Tashkent», tel / Fax /+998 71/ 255-05-51, 255-35-24, 254-26-87, 255-50-18 е-mail: uzblog_info@uzairways.com, uzblog_peo@uzairways.com, tnp.kmts@uzairways.com The deadline of bids: to 18: 00 on january 25, 2019. Competitive offers are accepted by mail, Fax, e-mail, on purpose.
17 Dec 2018

Heat Packs

The national airline "Uzbekistan Airways" announces a tender for the purchase of Heat Packs: The subject of the tender: Purchase and delivery of Heat Packs PN AHO89903 for Aircrafts Boeing B-757 in the amount of 10 pieces (delivery will be carried out in batches of 2 pieces, at the request of the buyer). General requirements: - Status - first category (only new). Meet the requirements and be supplied with certificates: - EASA or FAA - Certificate of origin Terms of payment: 1. 100% payment upon delivery of goods to Tashkent and registration of the customs regime of IM40 (free circulation) 2. Prepayment in the amount of 50% of the cost of the delivered products (for each lot) within 25 (twenty five) calendar days from the date of receipt of the invoice. The remaining 50% of interest will be paid within 20 (twenty) calendar days from the date of delivery of the goods. Terms of delivery: FCA - London, New York, Paris or any other airport, in accordance with the flight schedule of the National Air Company "Uzbekistan Airways" (in accordance with INCOTERMS-2010). Terms of delivery goods: Not more than 4 months from the receipt of the advance payment. The competition can be attended by companies and organizations that specialize in the production and supply of this type of goods, or have a working agreement with the manufacturers for its implementation and delivery. Bids are accepted at: To: Republic of Uzbekistan, Tashkent, 100167, Aviagorodok, AP Uzbekistan Airways Technics. To: Director of AP UAT to Mr. Kiyasov Ulugbek Makhmudkalievich. Phone / Fax: (+998 71) 255-68-22 E-mail: common@airtech.uz; timur_dekhkanbaev@inbox.ru; zaytseva_sveta@mail.ru; djavokhirnazarov@gmail.com. Contact person: Head of the Center - Svetlana Mikhailovna Zaitseva. Tel: 255-48-89                           Engineer of the Center - Timur Aliyevich Dekhkanbayev. Tel: +998974023399                           Engineer of the Center – Javokhir Feruzovich Nazarov. Tel: +998909617073 The deadline for closing bids: 07.01.2019. 15-00 hours Tashkent time.
17 Dec 2018

Tender for the purchase of Server

The national airline "Uzbekistan Airways" announces a tender for the purchase of Server DSU D4: The subject of the tender: Purchase and delivery of Server DSU D4 PN 183330-101 for Aircrafts Boeing B-787 in the amount of 1 ea. General requirements: Status - first category (only new). Meet the requirements and be supplied with certificates: EASA or FAA Certificate of origin Terms of payment: 1. 100% payment upon delivery of goods to Tashkent and registration of the customs regime of IM40 (free circulation) 2. Prepayment in the amount of 50% of the cost of the delivered products (for each lot) within 25 (twenty five) calendar days from the date of receipt of the invoice. The remaining 50% of interest will be paid within 20 (twenty) calendar days from the date of delivery of the goods. Terms of delivery: FCA - London, New York, Paris or any other airport, in accordance with the flight schedule of the National Air Company "Uzbekistan Airways" (in accordance with INCOTERMS-2010). Terms of delivery goods: Not more than 2 months from the receipt of the advance payment. The competition can be attended by companies and organizations that specialize in the production and supply of this type of goods, or have a working agreement with the manufacturers for its implementation and delivery. Bids are accepted at: To: Republic of Uzbekistan, Tashkent, 100167, Aviagorodok, AP Uzbekistan Airways Technics. To: Director of AP UAT to Mr. Kiyasov Ulugbek Makhmudkalievich. Phone / Fax: (+998 71) 255-68-22 E-mail: common@airtech.uz; timur_dekhkanbaev@inbox.ru; zaytseva_sveta@mail.ru; djavokhirnazarov@gmail.com. Contact person: Head of the Center - Svetlana Mikhailovna Zaitseva. Tel: 255-48-89 Engineer of the Center - Timur Aliyevich Dekhkanbayev. Tel: +998974023399 Engineer of the Center – Javokhir Feruzovich Nazarov. Tel: +998909617073 The deadline for closing bids: 07.01.2019. 15-00 hours Tashkent time.
27 Nov 2018

Repair of CFM 56-5B4/3 aircraft engines for BC A320CEO aircraft

Uzbekistan Airways Technics Aviation Enterprise (UAT) announces a tender for maintenance (repair) of CFM 56-5B4/3 aircraft engine for BC A320CEO aircraft operated by Uzbekistan Airways Name of works: Maintenance (repair) of CFM 56-5B4/3 aircraft engine for BC A320CEO aircraft Requirements to the Contractor: The contractor and/or his subcontractors shall have an Authorization to perform such kind of services issued by the Aviation authorities (EASA and FAA) and at least 5 (five) years of work experience in this field. Terms of work: In the process of repair, the Contractor shall be guided by the Technology of aircraft engine repairs and other regulatory technical documentation published and approved by the manufacturer - CFM International SA. The contractor shall provide a spare aircraft engine for rental by Uzbekistan Airways National Aircraft Company for the period of the maintenance (repair) works. Work site: 1. Repair shall be performed on the Contractor’s site in the properly equipped workshops. The repair period shall not exceed 60 calendar days. Requirements to the quality guarantees period and the works and services results: After the repair, the Contractor shall provide the following warranty for the aircraft engine: - 24 months for at least 5,000 FHR, or 2500 cycles, whichever event comes first. Proposals addressed to UAT Director Kiyasov Ulugbek M. (Commercial Department) shall be accepted before 5.00 pm of December 3, 2018 at the address: UAT, Aviogorodok, Tashkent, 100167, Uzbekistan Tel / Fax: +99871 - 255-55-28 E-mail: od_uat@mail.ru, od_uat@uzairways.com Reference person: Tatyana V. Krivosheina, Head of the contrac group sales department Tel.: +99871-255-55-28
27 Nov 2018

Maintenance (repair) of landing gears set for ВС A320CEO aircraft

Uzbekistan Airways Technics Aviation Enterprise (UAT) announces a tender for maintenance (repair) of landing gears set for BC A320CEO aircraft operated by Uzbekistan Airways Name of works: Maintenance (repair) of landing gears set for BC A320CEO aircraft Requirements to the Contractor: The contractor and/or his subcontractors shall have an Authorization to perform such kind of services issued by the Aviation authorities (EASA and FAA) and at least 5 (five) years of work experience in this field. Terms of work: In the process of repair, the Contractor shall be guided by the Technology of aircraft engine repairs and other regulatory technical documentation published and approved by the manufacturer - CFM International SA. The contractor shall provide a replacement kit of landing gears for rental by Uzbekistan Airways National Aircraft Company for the period of the maintenance (repair) works. Work site: Repair shall be performed on the Contractor’s site in the properly equipped workshops. The repair period shall not exceed 45 calendar days. Requirements to the quality guarantees period and the works and services results: After the repair, the Contractor shall provide the following warranty for the landing gear: - 36 months or 1 000 Flight cycles, whichever event comes first. Proposals addressed to UAT Director Kiyasov Ulugbek M. (Commercial Department) shall be accepted before 5.00 pm of December 3, 2018 at the address: UAT, Aviogorodok, Tashkent, 100167, Uzbekistan Tel / Fax: +99871 - 255-55-28 E-mail: od_uat@mail.ru, od_uat@uzairways.com Reference person: Tatyana V. Krivosheina, Head of the contract group sales department Tel.: +99871-255-55-28

Pages